County |
|
Average Costs |
$364,194.91 |
|
$116,233.33 |
1.13% |
32.86% |
0.09% |
10.08% |
0.30% |
0.45% |
0.21% |
0.00% |
0.42% |
0.42% |
1.65% |
1.20% |
0.11% |
0.11% |
0.10% |
0.03% |
1.43% |
0.17% |
0.09% |
0.30% |
0.27% |
1.92% |
0.08% |
0.42% |
0.92% |
0.82% |
1.74% |
0.11% |
0.88% |
0.04% |
0.11% |
2.67% |
0.01% |
2.00% |
2.23% |
2.02% |
1.76% |
0.04% |
0.63% |
0.01% |
0.30% |
0.12% |
0.21% |
1.60% |
0.66% |
0.22% |
0.51% |
0.21% |
0.00% |
0.59% |
0.25% |
1.00% |
0.28% |
0.80% |
0.92% |
1.47% |
0.27% |
2.38% |
0.57% |
2.09% |
0.13% |
0.72% |
0.21% |
1.05% |
2.55% |
0.39% |
0.90% |
0.04% |
1.12% |
0.55% |
1.09% |
0.54% |
1.42% |
0.23% |
0.07% |
0.13% |
0.00% |
0.47% |
0.12% |
0.00% |
0.26% |
0.95% |
0.46% |
0.19% |
0.14% |
0.30% |
0.09% |
0.02% |
0.02% |
0.22% |
0.04% |
0.32% |
|
State |
Construction Costs |
|
Lot Value |
Builder Profit |
Log/Timberframe Package |
Logs stacked to roof level |
Dry-In |
Arichitect, Engineering, Plans & Blueprints |
Permits - City/County |
Utility Connection Fees |
Demolition |
Clearing/Stakeout |
Rough Grading/Shoring/Fill |
Private Septic System |
Domestic Water/Well |
Pump House & Pressure Water System |
Rock |
Water Hookups |
Sewer Hookups |
Site Excavation |
Ground Plumbing |
Ground Mechanicals |
Ground Electric |
Underground Utilities |
Foundation walls |
Retaining walls |
Concrete slab poured - garage |
Concrete slab poured - house |
Superior walls (precast) |
Foundation complete |
Structural Masonry |
Rough framing materials |
Structural steel |
Mfg. floor trusses/components |
Rough framing labor |
Lightweight concrete interior floors |
Rough HVAC |
Rough electrical |
Rough plumbing |
Fireplaces including flues |
Security and communications pre-wiring |
Joist/SubFloor |
Underlayment |
Roof sheathing |
Waterproofing |
Gutters/downspouts/sheet metal |
Roof Covering |
Windows |
Exterior doors |
Exterior siding |
Exterior trim |
Stucco |
Masonry veneer |
Chimney |
Garage |
Garage doors |
Exterior painting |
Insulation |
Drywall/plaster |
Interior stairways |
Cabinetry |
Interior doors |
Interior trim |
Finish hardware |
Countertops |
Tubs/showers/enclosures |
Interior painting and wall coverings |
Hard surface finish - flooring |
Carpeting |
Appliances |
Security system |
Finish plumbing |
Plumbing fixtures |
Finish electrical |
Lighting fixtures |
Finish HVAC |
Bath accessories |
Tub and shower doors/mirrors |
Finish grading |
Pool/spa |
Hardscape - driveway/walkway/steps |
Landscaping |
Fencing |
Touch up - final clean up |
Decks/porches |
Final grading and seeding |
Rental Equipment |
Finish Basement Materials |
Builder Contingency |
Misc. |
Exterior Sheathing |
Temporary Utilities |
Solar Panels |
Radiant Heat |
Footers |